TIMELY EXIT – with video

DSCF6830

Mammoet Cranes lifts the top of the Petrolia Clock Tower off its base as it is moved to the parking lot across the street. The clock is in need of repairs and the wood structure which holds it up will be replaced with a steel structure and surrounded by decorative wood. The clock is expected to be replaced sometime this spring.

You can watch the tower coming down here: https://www.facebook.com/photo.php?v=4418264018126&comment_id=4161697

Heather Wright Photos

stw-petrolia clock 6 stw-petrolia clock 7 stw petrolia clock 1

Advertisements